国产精品三区四区video_午夜影院在线观看日韩_国产三级片在线一区_欧美高清专区一区_欧美一级人与嘼 视频_精品人妻少妇白浆无码_精品三级在线专区_手机国产高清欧美曰片_網友分享不卡国产视频心得_老师摸自己下面摸出白浆视频

Welcome to Guangdong Tianwei Construction Engineering Co., Ltd website!

Automatic control system engineering

Popular keywords: Automatic control system engineering Photovoltaic solar energy installation Purification air conditioning works

Your location:首頁(yè) > English > News > Trends
Requirements for floor paint engineering
return source:天瑋 Release date:2023-02-25
  loor paint primer is one of the most important steps in the construction of the floor process. After the primer is done, it can continue to carry out the next step of the construction process on the base surface. Generally, the primer used for floor coating should have good adhesion to the substrate; Good mechanical strength; The substrate has good protection performance and no adverse reaction with the middle coating and top coating; Can create a good foundation for the future coating, can not contain the infiltration of the upper coating caused by the malady of the components; At the same time, it has good constructability and dryness. After surface treatment, the first construction process is coating primer, which is the most basic work in the process of coating construction. The purpose of the bottom coating in the construction of floor paint is to create a good bonding force between the base surface and the subsequent coating, stabilize the base surface, and have good protection performance for the base surface. The primer film is dense and has a good sealing effect on the base surface. The most commonly used construction methods for coating epoxy floor primer are brush coating and roll coating. In the steps of floor primer construction, after handling the base surface, you can coat the primer and close the base surface. Base coating construction requirements:
1, the base surface should be fully dry.
2, with primer primer, do not need to add any solvent, direct coating.
3. After opening the bucket of floor paint material, fully stir and evenly before use.
4. When coating floor paint products, we should formulate construction plans according to the requirements of use.
5. Brush the corners with a brush.
Due to solvent volatilization faster, after opening the barrel to use up or closed with a lid, free curing.
The next floor paint coating shall be carried out according to the drying time and the best coating interval stipulated by the specific product conditions
View details Previous Anti-static floor construction scheme
View details Next 返回列表

Article label:Requirements for floor paint engineering

News

National Service Hotline

400-026-7588
?2023 Guangdong Tianwei Construction Engineering Co., Ltd copyright Record No:粵ICP備2022141555號(hào)

QQ

OnlineSincerely provide you with professional answer services

Hot line

400-026-7588
7*24 Hourly service hotline

WeChat

二維碼Scan WeChat communication
Top