国产精品三区四区video_午夜影院在线观看日韩_国产三级片在线一区_欧美高清专区一区_欧美一级人与嘼 视频_精品人妻少妇白浆无码_精品三级在线专区_手机国产高清欧美曰片_網友分享不卡国产视频心得_老师摸自己下面摸出白浆视频

Welcome to Guangdong Tianwei Construction Engineering Co., Ltd website!

Indoor and outdoor decoration works

Popular keywords: Automatic control system engineering Photovoltaic solar energy installation Purification air conditioning works

Heating piping

Project name:Heating piping

Project introduction: Heating piping
ServiceDetails Service Details
1, the heating pipeline should be set up inclination. The inclination of steam pipe flowing in the same direction is usually 0.003, and the inclination of steam pipe flowing in the opposite direction shall not be less than 0.005. The hot water pipe shall have a slope of not less than 0.002, slope discharge device.

2. The steam branch pipe should be connected above or from the side of the main pipe, and the hot water pipe should be connected below or from the side of the main pipe. Different working pressure of the drain pipe can not be connected to the same pipeline.

3. Eccentric reducing pipe should be used when horizontal pipeline is reduced in diameter. When the conveying medium is steam, take the bottom of the pipe flat, for drainage; When the conveying medium is hot water, take the pipe top flat to facilitate the exhaust.

4. The steam pipeline is usually laid on the right side of its forward direction, and the condensate pipeline on the left. The hot water pipe is on the right and the return pipe is on the left.

5, pipe through the wall or concrete floor should be installed waterproof sleeve.

6. The intersection Angle of directly buried pipeline crossing railway line and road shall not be less than 45°. The distance between pipe top and railway rail surface shall not be less than 1.2m, and the distance between pipe top and road surface shall not be less than 0.7m.

7, the pressure regulating valve should be vertically installed on the horizontal pipe, after the installation should be adjusted according to the application of working pressure. The reducing valve group is usually built at 1.2m above the road surface. If it is built at about 3m above the road surface, a permanent actual operating platform should be installed.

8. After the completion of pipeline construction, perform hydraulic test and cleaning according to the design scheme or standard specifications.

National Service Hotline

400-026-7588
?2023 Guangdong Tianwei Construction Engineering Co., Ltd copyright Record No:粵ICP備2022141555號(hào)

QQ

OnlineSincerely provide you with professional answer services

Hot line

400-026-7588
7*24 Hourly service hotline

WeChat

二維碼Scan WeChat communication
Top